Planning And Scheduling Of A G+6 Residential Building Using Primavera P6
Keywords:
Primavera P6, Residential Building, Construction Project Planning, Project Scheduling Work Breakdown Structure (WBS), Critical Path Method (CPM), Resource Allocation.Abstract
Application of primavera P6 in planning and scheduling of a G+6 Residential building Project. Effective planning and scheduling are critical to the successful execution of construction projects, ensuring timely completion, cost control, and optimal resource utilization. This current study focuses on the application of Primavera P6 software for planning and scheduling of G+6 Residential building project. A detailed Work Breakdown Structure (WBS) was developed to organize project activities logically. Activity durations are estimated based on standard productivity rates, construction practices, and available resources. Dependencies between activities are defined to establish the project sequence, and network diagrams were generated to identify the Critical Path. Resource allocation, including labor, materials, and equipment, was carried out to analyze resource utilization and avoid conflicts also in case of delayed activities the overall impact on the project is also assessed and appropriately rescheduled to compensate and optimize the project planning efficiently. Furthermore, the study highlights the importance of integrating planning with estimation and costing. By linking activity durations with resource requirements, engineers can forecast project expenses and cash flow requirements more accurately. This integration is particularly valuable for civil engineers working on consultancy projects, estimation reports, and residential building designs, as it supports better financial planning and project control. The results demonstrate that Primavera P6 significantly improves coordination among stakeholders, and helps in minimizing overall delays and cost overruns. The study concludes that adopting advanced project management tools like Primavera P6 in residential construction leads to better decision-making, efficient resource management, and successful project completion within planned time and budget.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Authors

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.










